AM-06 Asset Classification and Labelling
Classify assets and label them where practicable, with the responsible owners determining protection needs under one uniform scheme that defines levels for confidentiality, integrity, availability and authenticity, reflecting the information each asset processes, stores or transmits.
Source: BSI C5 (121-criteria catalogue), AM-06. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.
The edition of the catalogue is not stamped here; check the edition your attestation is issued against.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Register export showing the protection level held against each asset and who determined it · Policy repository / GRC workspace
periodic reviewEvidence produced at each review
none for this control
governing documentDocuments that govern the control
- Classification scheme defining the graded levels for each of the four protection objectives · Policy repository / GRC workspace
- Photographs or screen captures of the labels actually applied to media and equipment · Policy repository / GRC workspace
- Guidance mapping information types to the correct level under the scheme · Document repository
First move
Common gaps auditors find
- Scheme grades confidentiality alone and omits integrity, availability and authenticity
- Protection levels assigned centrally by a central team instead of by the asset owner
- Almost all assets sit at the lowest level because no determination was performed
- Physical media carry no marking, so the handling rules cannot be applied in practice
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetAM-05 Commitment to Permissible Use, Safe Handling and Return of Assets · BCM-01 Top management responsibility