AM-04 Decommissioning of Hardware
Require documented approval under the applicable policies before hardware supporting production cloud service components is withdrawn from use, and make withdrawal include complete and permanent erasure of the data or proper physical destruction of the storage media.
Source: BSI C5 (121-criteria catalogue), AM-04. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.
The edition of the catalogue is not stamped here; check the edition your attestation is issued against.
These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.
system holds itEvidence a system already holds
- Erasure tool output recording the method used and the verification result · Document repository
periodic reviewEvidence produced at each review
- Retirement approvals for hardware withdrawn from the production estate during the period · Document repository
- Sanitisation or destruction certificates that identify the media by serial number · Data governance / DLP tooling
governing documentDocuments that govern the control
- Chain of custody documentation for media released to a disposal contractor · Policy repository / GRC workspace
First move
Common gaps auditors find
- Failed drives returned to the vendor under warranty without prior sanitisation
- Destruction certificates do not identify which specific media they cover
- Erasure carried out but the verification step is missing from the record
- Equipment physically removed before the withdrawal approval was obtained
Do this for your whole sheet
Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.
Build my evidence sheetAM-03 Commissioning of Hardware · AM-05 Commitment to Permissible Use, Safe Handling and Return of Assets