EvidenceSheet

AM-02 Acceptable Use and Safe Handling of Assets Policy

Document, communicate and issue acceptable use and safe handling instructions spanning approval for acquisition through disposal, classification and labelling, secure configuration, software versions and patching, unsupported software, installation restrictions, malware protection, remote wipe, physical transport, incident handling and irreversible deletion at decommissioning.

Source: BSI C5 (121-criteria catalogue), AM-02. The statement above is our statement of the clause, read from the published text and cited so you can check it against the official text, not the instrument verbatim. Open BSI C5 (121-criteria catalogue) in the compliance library.

The edition of the catalogue is not stamped here; check the edition your attestation is issued against.

4
artefacts
1
held by a system
0
at each review
moderate
to go live
Endpoint management (MDM / EDR)
where the evidence lives
teal = a system already holds it · olive = produced at each review. To go live: easy when half or more of the artefacts are already held by a system, moderate from a quarter to a half, hard below a quarter.

These are the artefacts auditors commonly ask for on this requirement, our guidance rather than text from the standard. Your assessor decides what is sufficient in your context, and asks for samples across the period when a report covers one.

system holds itEvidence a system already holds

  • Device management configuration for installation restrictions, malware protection and remote wipe · Endpoint management (MDM / EDR)

periodic reviewEvidence produced at each review

none for this control

governing documentDocuments that govern the control

  • Acceptable use and handling standard covering every stage of the asset lifecycle · Policy repository / GRC workspace
  • Hardening baselines it references for error handling, logging, encryption and authorisation settings · Policy repository / GRC workspace
  • Support lifecycle list showing how products past vendor support are treated · Vendor register / contract repository

First move

Start with the 1 of 4 artefacts that already live in a system (Endpoint management (MDM / EDR)); keep the periodic reviews but log each one as a dated record with a named reviewer.

Common gaps auditors find

Do this for your whole sheet

Paste the rows you run your controls from and get this mapping for every control at once, with the periodic-review ones flagged and a first move per row. No account for the first run.

Build my evidence sheet

AM-01 Asset Inventory · AM-03 Commissioning of Hardware